Engineering News-Record: Water | Woes | Remedies
In Atlanta, a severe drought in 2009 made the city realize that it needed a longer-term source of water, so planning began for a tunnel solution to provide an alternative water source for the metro area of 4 million people. The $300-million project, including a five-mile-long tunnel, is being built to connect the 400-ft-deep quarry